To the central content area

The Industrial Wastes Database Management and Flow Control Administration Project

Absrtact
The works of the Project included: thoroughly checked 4,340 incidences that had not made declarations online or had not submitted the industrial waste disposal plan and tracked the industrial waste flow. As the results, 1,690 companies were de-controlled, while 131 put back to the control list. Through the above mentioned work, during the Project¡s implementation period, on-line declaration rate reached 99.4%, and the submission rate of clearance plans reached 98.6% with an approval rate of 97.6%. The industrial waste flow has tracked in 30,376 cases, and 13 designated types were established. In order to integrate the evaluation work of clearance planning reports and to elevate the quality of submissions, 30 major categories of industries and their industrial waste clean-up plans references were completed, as well as ¡ raw materials, products, and waste correspondence chart (including manufacturing procedures and units),¡ and standard review manuals. In terms of industrial waste clean-up plans evaluation, 13,127 businesses were reviewed, and transferred for further tracking and consultation. The achievements of this project can be summarized as: 1.enhanced the reporting quality and the tracking of unreported hazardous industrial waste effectively and strengthened the regional auditing management; 2. improved the completeness and accuracy of the baseline information of the database for the industrial waste control system; 3. deployed full time professional technical staff to enhance the business execution capacity of environmental protection bureaus.
Keyword
Industrial wastes, disposal plan, on-line declaration rate, disposal flow, submission rate
Open
top